Auckland Eye Institute

The client was looking for a robust system that would protect the expensive cars that use his eye clinic. The product had to be durable, strong, and flexible enough to handle some movement. Also, a concrete wear slab was the preferred choice of finishes to take car traffic.

ArchitectArchimedia
ContractorWatts & Hughes Construction
Date2015
Size400 m2

SOLUTION
As the project would be staged to allow construction to progress a 2x10mm of Pacoflex Mastic Asphalt was selected as the perfect solution due to its fluidity and ability to easily join this product at a later stage.

Asphaltech and their qualified tradesmen worked on this project with limited space and movement during the later stages of the construction project. Due to tight deadlines once again, the finished waterproofing was loaded with tonnes of product to complete the project.

A complete QA package was handed over to the client at the end of the project showing sign off sheets and pictures during construction.