SOLUTION
Asphaltech carried out the areas in various stages due to the method of construction. The exposed areas to the front were painted with a waterproofing solar reflective paint. The decks were covered with tiles on pedestals and the carpark was laid with mastic asphalt waterproofing and covered with a hot mix wear layer.
A complete QA package was handed over to the client at the end of the project showing sign off sheets and pictures of complicated details during construction.