Queen’s Square

438 Queen Street, Auckland Central, Auckland

Conrad Properties and Leuschke Group Architects had a complicated podium with the usual range of finishes, tiles, grass, and plants. As our products had been selected on several previous projects with great success. The choice for specification was simple – our Neuchâtel Mastic Asphalt system was used. Scarboro’s onsite team were delighted with the overall application, quality and skill level of our preferred installation team at Asphaltech.

ArchitectLeuschke Group
ContractorScarbro
Date2017
Size400 m2

SOLUTION
Once again, Neuchâtel Mastic Asphalt proved its resilience in the demanding construction environment of New Zealand. Our podium system was the system of choice for this apartment project.

Let’s talk about waterproofing your project.

Call Neuchatel for a chat on 09 441 4595 or email info@neuchatel.co.nz