SOLUTION
Neuchâtel Mastic Asphalt, enhanced with aggregates, was the clear choice for the plant room roof. This system not only serves as a robust waterproofing solution but also accommodates maintenance foot traffic throughout the building’s lifespan.
For the lower deck areas, aggregates were omitted from the specification. Instead, decorative tiles were applied atop a pedestal jack system, ensuring a visually appealing finish without compromising the integrity of the waterproofing.